Case Study : Design of Warren Truss Steel Footbridge

S.O.S MIDAS Academy: How I Design Bridges 14th January 2021 (Thu)
8:00 - 9:00 AM (Romania)
2:00 - 3:00 PM (Singapore)
5:00 - 6:00 PM (Sydney)

Click here to see it in your local time
EVENT Register now
Case Study : Design of Warren Truss Steel Footbridge S.O.S MIDAS Academy: How I Design Bridges 14th January 2021 (Thu)
8:00 - 9:00 AM (Romania)
2:00 - 3:00 PM (Singapore)
5:00 - 6:00 PM (Sydney)

Click here to see it in your local time
OVERVIEW

Footbridges have certain characteristics that require special design considerations and procedures. Their design is usually a result of close collaboration between architects and engineers. The lightweight nature of footbridges can be an advantage as it allows us to use different forms and materials.

 

At the same time, the designers must pay close attention to issues like vibration, dynamic behavior, and detailing. This webinar will discuss a case study of a steel truss footbridge design.

AGENDA
  • 5 mins

    Introduction

  • 45 mins

    Design of Warren Truss Footbridge

    We will see what are footbridge design specifics and challenges in Eurocode and the whole process of modeling, analysis, design of a steel truss footbridge with midas Civil.

  • 10 mins

    Question & Answer

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

KEY POINTS

Key point 1: Footbridge Design Specifics and Challenges

A footbridge (pedestrian bridge) often needs its appearance for aesthetics. At the same time, the bridge needs to be satisfied with stability and vibration issues. The webinar will highlight their details.

 

Key point 2: Eurocode Requirements

We will look into Eurocode details that are applicable to the design of a footbridge.

 

Key point 3: Case Study - Warren Truss Footbridge

Let's see a case study about Warren Truss Footbridge and look at how principles and code requirements are implemented in the design and how midas Civil can help engineers.

SPEAKER
  • Martin Bosak

    Senior Engineer | Barry Transportation, UK

    - 15 Years experience in structural bridge design
    - Specialization in concrete bridges
    Participated in the design at major infrastructure projects across Europe
    - Czech Republic (D3 Motorway, R48 Expressway, I/11)
    - Slovakia (D3 Motorway)
    - UK (A5 Northern Ireland, A737 Scotland)
  • Martin Bosak

    Senior Engineer | Barry Transportation, UK

    - 15 Years experience in structural bridge design
    - Specialization in concrete bridges
    Participated in the design at major infrastructure projects across Europe
    - Czech Republic (D3 Motorway, R48 Expressway, I/11)
    - Slovakia (D3 Motorway)
    - UK (A5 Northern Ireland, A737 Scotland)
Read all
REGISTER The event is done.
Thank you for your interest.
REGISTER You are registered.

Thanks for registration.
The registration confirmation email has been sent to your email

REGISTER You are registered.

Thanks for registration.
Please check the confirmation email from GoToWebinar for joining the session.

INFORMATION
Event
Case Study : Design of Warren Truss Steel Footbridge
Date
January 14, 2021, 8:00 - 9:00 AM (Romania)

January 14, 2021, 2:00 - 3:00 PM (Singapore)

January 14, 2021, 5:00 - 6:00 PM (Sydney)
Date & Location
Date & Location
Document
Notice

1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.