Case Study : Analysis for Assessment of Iconic Steel Structure Connel Bridge

Top 5 MIDAS Bridge Webinars of 2021 29th June 2021 (Tue)
11:30 - 12:30 PM (India)
2:00 - 3:00 PM (Singapore)
4:00 - 5:00 PM (Sydney)

Click here to see it in your local time
EVENT Register now
Case Study : Analysis for Assessment of Iconic Steel Structure Connel Bridge Top 5 MIDAS Bridge Webinars of 2021 29th June 2021 (Tue)
11:30 - 12:30 PM (India)
2:00 - 3:00 PM (Singapore)
4:00 - 5:00 PM (Sydney)

Click here to see it in your local time
OVERVIEW

This session will describe all the steps of the assessment process of the existing iconic steel bridge in Scotland, Connel Bridge, with midas Civil. Connel Bridge, a typical cantilever steel bridge, is a riveted steel structure 224m long which comprises 77m cantilever sections supporting a 70m suspended span.

 

The client requested that Jacobs carry out an assessment of the structural capacity of the bridge to British Standards. The speaker will explain the knowledge of available record information and inspection for assessment during the session.

AGENDA
  • 5 mins

    Introduction and Project Overview

  • 45 mins

    Assessment Process of Connel Bridge

    - Knowledge of available record information

    - inspection for assessment

    - Analysis and capacity check in midas Civil program

  • 10 mins

    Question & Answer

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

KEY POINTS

Key point 1: Why are bridge assessments needed?

Assessment of the bridge refers to evaluating the various functions of the existing bridge to judge the practicality and safety of the bridge. Purposes of assessment of bridge are analyzing a structural defect, evaluating the safety and practicality of old bridges, maximizing economic use by extending the life of the existing bridge, and providing necessary data for maintenance of existing bridges

 

Key point 2: Assessment process

We want to learn about the precise assessment process carried in UK, and the speaker will introduce all the steps of assessment process for the existing bridges and explain the useful functions of midas Civil which were applied in this project.

 

Key point 3: Modelling Consideration

During the modeling of the Connel Bridge in midas Civil, a speaker will show the step-by-step modeling process of a typical steel bridge using various modeling functions of midas Civil.

SPEAKER
  • Javier Lancho

    Principal Bridge Engineer | Jacobs, UK

    Javier is a chartered MSc Civil Engineer and MSc Structural Engineer with 19 years of service in the design and assessment of bridges, civil structures, and building structures.He has been involved in projects located in different countries, therefore he is familiar with the international working environment and with different structural design codes.
  • Javier Lancho

    Principal Bridge Engineer | Jacobs, UK

    Javier is a chartered MSc Civil Engineer and MSc Structural Engineer with 19 years of service in the design and assessment of bridges, civil structures, and building structures.He has been involved in projects located in different countries, therefore he is familiar with the international working environment and with different structural design codes.
Read all
REGISTER The event is done.
Thank you for your interest.
REGISTER You are registered.

Thanks for registration.
The registration confirmation email has been sent to your email

REGISTER You are registered.

Thanks for registration.
Please check the confirmation email from GoToWebinar for joining the session.

INFORMATION
Event
Top 5 MIDAS Bridge Webinars of 2021

Case Study : Analysis for Assessment of Iconic Steel Structure Connel Bridge
Date
June 29, 2021, 11:30 - 12:30 PM (India)

June 29, 2021, 2:00 - 3:00 PM (Singapore)

June 29, 2021, 4:00 - 5:00 PM (Sydney)
Date & Location
Date & Location
Document
Notice

1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.