The latest Installs, patches and release notes
Customer HubSearch our knowledge base, or open technical queries
Explore engineering trends, case studies, tricks, and tips
EventsTechnical seminars and webinars by bridge experts
Bridge Insight : New Development in Long Span Arch Bridges
The bridge with the total length of 1,164m is formed by 357.5m long main bridge across the
River Nitra and the 806.5m long approach viaduct. The main bridge has 5 spans of length from
50 to 85m. The decks of three-cell box section are casted segment-by-segment in symmetrical
cantilevers. The viaduct is formed by twin bridges of one-cell box section. The bridge with spans
from 28 to 45m was incrementally launched.
Fig. midas Civil Analysis Result Diagram of Nitra Bridge
Fig. Nitra Bridge
Fig. Nitra Bridge
Sumavska 524/31, 602 00 Brno, Czech Republic
It assists clients in the design and construction of a wide range of bridgeand motorway structures, from pedestrian bridges to multi-lane long-spanstructures, and unique or special designs for landmark structures. Theirexperience includes cable-suspension and cable-stayed bridges, precast andcast-in-place segmental concrete and arch bridges.
No waiting. No nasties. No credit card required.
Start Free Trial Talk to consultants