Project Applications

Liede Bridge

Main features used in this application Steel box composite girder Elastic catenary cable element Moving load analysis Temperature load analysis

Description on this project

Liede Bridge opened in 2009 is a bridge crossing over the Pearl River in Guangzhou, Guangdong, China. It’s a single tower self-anchored suspension bridge structure to rewrite the history of Guangzhou without a suspension bridge. The total length is 4.3km and its single tower two span 219 + 167m main span.

 

  • Fig. midas Civil Analysis Model of Liede Bridge

  • Fig. midas Civil Analysis Result Diagram of Liede Bridge

Project Contact Sichuan Southwest Jiaotong University Civil Engineering Design Co., Ltd.
  • Address

    No. 111, Southwest Jiaotong University Innovation Building, 18,19,20, Second Ring Road, Chengdu Jinniu District, China

  • Introduction

    The firm was established in 1992. It’s the first school that opened civil engineering. Training of well-known bridge experts Mao Yisheng, Mr. Zhang Tongyan prestige, phenology experts Zhu Kezhen and the Chinese Academy of Sciences, Academy of Engineering more than 50 people in the long-span bridge research has always been a leading position in the country.

  • Website

    www.jdtm.com.cn

  • Email

Location

Guangzhou, China

Architect

NEXT Architects

Engineering Consultant

Sichuan Southwest Jiaotong University Civil Engineering Design Co., Ltd.

Construction Period

Completed in 2009

Type of Project

Self-anchored Suspension Bridge

Size of Structure

219m Main Span, 4.3km Total Length