The latest Installs, patches and release notes
Customer HubSearch our knowledge base, or open technical queries
Explore engineering trends, case studies, tricks, and tips
EventsTechnical seminars and webinars by bridge experts
Bridge Insight : New Development in Long Span Arch Bridges
Illustrating on a case study of the continuous steel composite ladder deck bridge, the webinar will highlight major factors to consider in the design of this type of bridge, such as shear lag and buckling effects. It will provide recommendations on suitability and use of different model types. Since many of ladder deck bridges are constructed using the push launch method, special considerations for the construction sequence will be discussed.
This session is recommended for bridge engineer who want to learn fundamentals of time history analysis in detail.
Introduction
Case Study : Steel Ladder Deck Bridge Design
Workflow overview of the ladder deck steel bridge design. Discussion of main considerations and steps necessary for an efficient modelling and analysis.
Question & Answer
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
Key Point 1:Purpose of Different Model Types for Steel Bridge Design
More than one type of structural model may be necessary for the steel bridge design. The speaker will talk about the purpose of different modelling methods and how those models can be created.
Key Point 2:Deck Slab Considerations
The presentation will discuss whether and how to include effects of shear lag in concrete deck as well as cracked concrete over bridge supports.
Key Point 3:Special Considerations for Push Launch Construction
Stability of the bare steel structure during construction may be a deciding factor in the design. The webinar will provide guidance in this important aspect of the bridge design.
Senior Engineer | Barry Transportation, Ireland
- Over 15 Years Experience in Structural Bridge DesignSenior Engineer | Barry Transportation, Ireland
- Over 15 Years Experience in Structural Bridge DesignThanks for registration.
The registration confirmation email has been sent to your email
Thanks for registration.
Please check the confirmation email from GoToWebinar for joining the session.
1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.
1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.
Participate in Survey event. 16 GB USB-flash drive will be provided to the one who submit the survey. Participate in Survey event. 16 GB USB-flash drive will be provided to the one who submit the survey. Participate in Survey event. 16GB USB-flash drive will be provided to the one who submit the survey.
Learn morea. Information Processed
The minimum amount of personal information required for the provision of the service is being collected. In the process of the sign-up for membership or the use of the service, the Company is collecting the minimum amount of personal information required to provide the service through a separate application or program as follows:
Processing Personal Informationb. Method of Collection
When collecting the personal information, the Company makes sure to inform the user in advance and request for the user’s approval. The personal information is being collected in the following ways:
The personal information to be collected from the user in using the service is as follows:
The Company uses the personal information for the following purposes including managing membership, providing and improving customized services, calculating fees incurred for the services, developing new services, and providing information for service-related events and promotion; provided, however, that the Company shall not use the member’s personal information if the member has expressed his/her intention that he/she does not want to provide the information for service-related events and promotion. The Company shall not be held liable for any disadvantage that may arise to the member as a result thereof.
The personal information shall be destroyed upon achievement of the purposes of collecting and using it, and the procedures and methods for destruction is as follows.
The personal information stored in the form of an electronic file will be deleted so that such information shall not be restored and reproduced. Other records, print-outs, written documents will be shredded and incinerated; provided, however, that the data that will be stored for a certain period of time in accordance with internal policy are as follows:
Records to be Retained | Grounds of Retention | Period of Retention |
---|---|---|
Records on agreement and withdrawal | Act on the Consumer Protection in | 5 years |
Records on payment and product supplies, etc. | Electronic Commerce, etc. | 5 years |
Records on consumer complaints or dispute handling | 3 years | |
Records on marks/advertisement | 6 months | |
Books and evidential documents on all transactions as specified in tax law | Framework Act on National Taxes | 5 years |
Books and evidential documents on all transactions as specified in tax law | Framework Act on National Taxes | 5 years |
Records on electronic financial transactions | Electronic Financial Transactions Act | 5 years |
Records on log-in history in connection with the use of the service | Protection of Communications Secrets Act | 3 months |