Case Study: Composite Steel Integral Bridge

MIDAS Academy : How I Design Bridges August 13, 2020 (Thur) - Online Webinar

12:00 PM - 1:00 PM (UK)
7:00 PM - 8:00 PM (Singapore)
9:00 PM - 10:00 PM (Sydney)

Click here to see it in your local time
EVENT CLOSED Register now
CLOSED
Case Study: Composite Steel Integral Bridge MIDAS Academy : How I Design Bridges August 13, 2020 (Thur) - Online Webinar

12:00 PM - 1:00 PM (UK)
7:00 PM - 8:00 PM (Singapore)
9:00 PM - 10:00 PM (Sydney)

Click here to see it in your local time
OVERVIEW

Takomborerwa Hove who is a senior engineer in AECOM UK will introduce a bridge design carried out in 2017 for new Composite integral bridge. The B9090 White Bridge Replacement project was commissioned by The Highland Council, Designed by AECOM and constructed by RJ McLeod.

 

The replacement bridge was commission to bypass a Category A Listed stone bridge, which was built in the early 1750. The new bridge is a 40m span integral steel/concrete composite structure designed to support the realigned B9090 over the River Nairn.

 

The webinar will highlight how Midas was used to the design of the new structure. It will also cover points including how long term effect and construction sequence were considered.

AGENDA
  • 5 mins

    Introduction

  • 45 mins

    Case Study: Composite Steel Integral Bridge

    We will see how the bridge replacement project went and how to design the steel composite bridge.

  • 10 mins

    Question & Answer

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

  • 12:00 - 14:00 SESSION 2-1

    3D Excavation and Piled-Raft Foundation

    [Part 1] 3D Geometry modeling and Meshing
    [Part 2] Analysis control and checking results.

KEY POINTS

Key Point 1: Construction sequence for bridge 

Piles, beams and deck are constructed in a sequence and it will be demonstrated. The results should take account accumulated dead loads. This is easy work process if you know how to use grouping function in midas Civil.

 

Key Point 2: Consideration of long-term effect 

There is not only a way to consider long-term effect in the analysis. This webinar will show you apply multiple modulus of elasticity for the concrete. And we can assign the second modulus of elasticity to permanent dead loads.

 

Key Point 3: Automatic steel member design reports

Steel Code Check simply checks the sections that you have defined against the relevant checks for axial, bending and shear checks. Optimal Design Section seeks to select the best section taking into account loads in model. This offers a relatively quick and easy way to check sections with the model and a quick way to identify the most heavily loaded member.

SPEAKER
  • Takomborerwa Hove

    Seninor Engineer | AECOM UK


    Takomborerwa is a Senior Engineer within the Bridges Section of AECOM’s Glasgow office with 7 years experience in the design, specification and construction of Highway Structures.
  • Takomborerwa Hove

    Seninor Engineer | AECOM UK


    Takomborerwa is a Senior Engineer within the Bridges Section of AECOM’s Glasgow office with 7 years experience in the design, specification and construction of Highway Structures.
Read all
REGISTER The event is done.
Thank you for your interest.
REGISTER You are registered.

Thanks for registration.
The registration confirmation email has been sent to your email

REGISTER You are registered.

Thanks for registration.
Please check the confirmation email from GoToWebinar for joining the session.

INFORMATION
Event
How I Design Bridge - Case Study: Composite Steel Integral Bridge
Date
August 13, 2020 (Thur) 12:00 PM - 1:00 PM (UK)
August 13, 2020 (Thur) 7:00 PM - 8:00 PM (Singapore)
August 13, 2020 (Thur) 9:00 PM - 10:00 PM (Sydney)
Date & Location
Who should attend
GTS NX Training Workshop in Kuala Lumpur
Date & Location
Document
Notice

1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.