Bridge Insight : New Development in Long Span Arch Bridges
The Centennial Bridge in the city of Oradea, Romania was commissioned by Oradea City Hall to a joint venture formed of FreyRom SA & Procons SA and was designed by Integrated Road Solutions SRL in 2017-2018.
The bridge was built during 2018 and was opened to traffic on 1st of December 2018, to mark the 100 years since the country was united. The bridge is an arch having a span of approximately 80m and supports a two lanes carriageway and also 2 footways with a width of 3m each.
The webinar will highlight how Midas was used to the design of the new structure. It will also cover points including how construction sequence was considered, and some aspects regarding the seismic behavior.
Key Point 1: Construction sequence for bridge
Abutments, deck installation and the cables installation are constructed in a sequence, with the results taking into account accumulated dead loads. In this part we will see how the model was realised following the entire technological process of construction.
Key Point 2: Seismic Analysis
Initially the bridge statical scheme proposed in the feasibility study has been a restrained arch at both ends. However, during the design, it was observed that the fundamental period of the bridge was practically the same with corner period of the local area. Even if the area in which the bridge is constructed is one of the less dangerous in the country, having these two periods so close is not something desirable. In this part of the presentation we will see how the fundamental period of the bridge was changed and how the usage of dampers helped in achieving the desired result.
Key Point 3: Design reports
We will see here how Midas Civil can help you with the design of various elements of the structure.
Introduction
Case Study: Cable-arch bridge analysis with seismic damper
We will see how the project went and what were the key points during design.
Question & Answer
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
Senior Engineer | Integrated Road Solutions SRL, Romania
He is a Senior Engineer at Integrated Road Solutions SRL , experienced in design of various kind of bridges and has over 25 years of experience in the field having worked in various countries as: Romania, UAE, SpainSenior Engineer | Integrated Road Solutions SRL, Romania
He is a Senior Engineer at Integrated Road Solutions SRL , experienced in design of various kind of bridges and has over 25 years of experience in the field having worked in various countries as: Romania, UAE, SpainThanks for registration.
The registration confirmation email has been sent to your email
Thanks for registration.
Please check the confirmation email from GoToWebinar for joining the session.
1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.
1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.
Participate in Survey event. 16 GB USB-flash drive will be provided to the one who submit the survey. Participate in Survey event. 16 GB USB-flash drive will be provided to the one who submit the survey. Participate in Survey event. 16GB USB-flash drive will be provided to the one who submit the survey.
Learn morea. Information Processed
The minimum amount of personal information required for the provision of the service is being collected. In the process of the sign-up for membership or the use of the service, the Company is collecting the minimum amount of personal information required to provide the service through a separate application or program as follows:
Processing Personal Informationb. Method of Collection
When collecting the personal information, the Company makes sure to inform the user in advance and request for the user’s approval. The personal information is being collected in the following ways:
The personal information to be collected from the user in using the service is as follows:
The Company uses the personal information for the following purposes including managing membership, providing and improving customized services, calculating fees incurred for the services, developing new services, and providing information for service-related events and promotion; provided, however, that the Company shall not use the member’s personal information if the member has expressed his/her intention that he/she does not want to provide the information for service-related events and promotion. The Company shall not be held liable for any disadvantage that may arise to the member as a result thereof.
The personal information shall be destroyed upon achievement of the purposes of collecting and using it, and the procedures and methods for destruction is as follows.
The personal information stored in the form of an electronic file will be deleted so that such information shall not be restored and reproduced. Other records, print-outs, written documents will be shredded and incinerated; provided, however, that the data that will be stored for a certain period of time in accordance with internal policy are as follows:
Records to be Retained | Grounds of Retention | Period of Retention |
---|---|---|
Records on agreement and withdrawal | Act on the Consumer Protection in | 5 years |
Records on payment and product supplies, etc. | Electronic Commerce, etc. | 5 years |
Records on consumer complaints or dispute handling | 3 years | |
Records on marks/advertisement | 6 months | |
Books and evidential documents on all transactions as specified in tax law | Framework Act on National Taxes | 5 years |
Books and evidential documents on all transactions as specified in tax law | Framework Act on National Taxes | 5 years |
Records on electronic financial transactions | Electronic Financial Transactions Act | 5 years |
Records on log-in history in connection with the use of the service | Protection of Communications Secrets Act | 3 months |