The latest Installs, patches and release notes
Customer HubSearch our knowledge base, or open technical queries
Explore engineering trends, case studies, tricks, and tips
EventsTechnical seminars and webinars by bridge experts
Bridge Insight : New Development in Long Span Arch Bridges
It is essential to consider traffic loads when we design bridges. And engineers must be aware how to apply the traffic loads according to the relevant design code. Engineers would be happy with the software if the software automatically considers the things specified in the design code. Midas Civil had only few vehicles as per AS5100.2 before. But now more vehicles are available and some more powerful features has been updated since the version 2020 v3.1.
We will see the details of the updates regarding traffic loads according to AS code in midas Civil.
Introduction
Australian Traffic Load Update: HLP, Rail, And Rating
Let's see how midas Civil has been updated according to AS code in regard with traffic loads.
Question & Answer
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
3D Excavation and Piled-Raft Foundation
[Part 1] 3D Geometry modeling and Meshing
[Part 2] Analysis control and checking results.
Key Point 1: Traffic Loads Update according to AS5100
Heavy Load Platform, Rail loadings, and the vehicles for rating of existing bridges are now available from midas Civil 2020v3.1. It will allow users to have more precise analysis than before.
Key Point 2: How midas Civil considers Australian Standard
There are many clauses including various factors that we need to take account in AS code. For example, variable spacing between the axle loads, lane factors, dynamic load allowance factors, etc. We will learn how we consider those using midas Civil.
Key Point 3: Deep Understand of Moving Load Analysis in midas Civil
Beginner users of midas Civil make mistake sometimes by ignoring the various option in midas Civil. If you rely on default values in the functions, we may see the wrong analysis results. We should have the right understanding when we use a certain function.
Technical Planning Manager / MIDAS IT
Msc.Civil and Structural Engineering
Technical Planning Manager / MIDAS IT
Msc.Civil and Structural Engineering
Thanks for registration.
The registration confirmation email has been sent to your email
Thanks for registration.
Please check the confirmation email from GoToWebinar for joining the session.
1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.
1. Participation of this seminar is FREE.
2. We recommend you to register immediately since the number of seats are limited.
3. If you come early to the seminar place, you can enjoy the welcome snack and coffee/tea.
4. For effective training session, we recommend you to bring your personnel laptop computer in order to get the hands-on experience of MIDAS software.
5. Training license and installation guide will be provided to all registrants before the seminar in advance.
Participate in Survey event. 16 GB USB-flash drive will be provided to the one who submit the survey. Participate in Survey event. 16 GB USB-flash drive will be provided to the one who submit the survey. Participate in Survey event. 16GB USB-flash drive will be provided to the one who submit the survey.
Learn morea. Information Processed
The minimum amount of personal information required for the provision of the service is being collected. In the process of the sign-up for membership or the use of the service, the Company is collecting the minimum amount of personal information required to provide the service through a separate application or program as follows:
Processing Personal Informationb. Method of Collection
When collecting the personal information, the Company makes sure to inform the user in advance and request for the user’s approval. The personal information is being collected in the following ways:
The personal information to be collected from the user in using the service is as follows:
The Company uses the personal information for the following purposes including managing membership, providing and improving customized services, calculating fees incurred for the services, developing new services, and providing information for service-related events and promotion; provided, however, that the Company shall not use the member’s personal information if the member has expressed his/her intention that he/she does not want to provide the information for service-related events and promotion. The Company shall not be held liable for any disadvantage that may arise to the member as a result thereof.
The personal information shall be destroyed upon achievement of the purposes of collecting and using it, and the procedures and methods for destruction is as follows.
The personal information stored in the form of an electronic file will be deleted so that such information shall not be restored and reproduced. Other records, print-outs, written documents will be shredded and incinerated; provided, however, that the data that will be stored for a certain period of time in accordance with internal policy are as follows:
Records to be Retained | Grounds of Retention | Period of Retention |
---|---|---|
Records on agreement and withdrawal | Act on the Consumer Protection in | 5 years |
Records on payment and product supplies, etc. | Electronic Commerce, etc. | 5 years |
Records on consumer complaints or dispute handling | 3 years | |
Records on marks/advertisement | 6 months | |
Books and evidential documents on all transactions as specified in tax law | Framework Act on National Taxes | 5 years |
Books and evidential documents on all transactions as specified in tax law | Framework Act on National Taxes | 5 years |
Records on electronic financial transactions | Electronic Financial Transactions Act | 5 years |
Records on log-in history in connection with the use of the service | Protection of Communications Secrets Act | 3 months |