MIDAS CIVIL Integral Bridges Soil Structure Interaction Tips & Tutorials Substructures Bridge Engineering Spring Support
The Latest Engineering Trends and Issues
MIDAS CIVIL Integral Bridges Soil Structure Interaction Tips & Tutorials Substructures Bridge Engineering Spring Support
MIDAS CIVIL Integral Bridges Case Study Construction Stage Analysis Composite Bridge Design Composite Steel Global Structural Analysis Grillage Deck Composite Action
This webinar shows a bridge design carried out in 2017 for new Composite integral bridge.The B9090 White Bridge Replacement project was commissioned by The Highland Council, Designed by AECOM and constructed by RJ McLeod. The replacement bridge was commission to bypass a Category A Listed stone bridge, which was built in the early 1750. The new bridge is a 40m span integral steel/concrete composite structure designed to support the realigned B9090 over the River Nairn.
MIDAS CIVIL Bridge Design Integral Bridges Soil Structure Interaction Case Study Continuum Media Spring Analogy Retaining Structures
MIDAS CIVIL Integral Bridges Case Study Structural Analysis Time Dependent Material Properties Construction Stages
This case study covers the following aspects: