Integral Bridge Function in midas Civil

midasBridge TeamJuly 6, 2022

 

 

Composite Steel Integral Bridge Analysis and Design

midasBridge TeamJuly 14, 2021

Composite Steel Integral Bridge Analysis and Design

 

Composite Steel Integral Bridge

midasBridge TeamMarch 4, 2021

This webinar shows a bridge design carried out in 2017 for new Composite integral bridge.The B9090 White Bridge Replacement project was commissioned by The Highland Council, Designed by AECOM and constructed by RJ McLeod. The replacement bridge was commission to bypass a Category A Listed stone bridge, which was built in the early 1750. The new bridge is a 40m span integral steel/concrete composite structure designed to support the realigned B9090 over the River Nairn.

Fundamentals of Soil Structure Interaction Analysis for Integral Bridges

midasBridge TeamMarch 4, 2021

 

Integral Bridge Analysis: Forder Valley Viaduct Bridge

midasBridge TeamFebruary 9, 2021

This case study covers the following aspects: