Steel Composite Bridge Design

March 4, 2021
BLOG BRIDGE INSIGHT

Please fill out the Download Section (Click here) below the Comment Section to download the Full Webinar PDF File

 

 

In February 2019,  we hosted a webinar, "Case Study of Steel Composite Bridge Design" by Marco Bonomo, Senior Bridge Engineer, Atkins, UK

 

The webinar shows a case study of designing steel composite bridge.

 

        


Key Points

 

In this webinar, through a case study of a steel composite bridge based in the UK we will discuss about:

 

1. Friendly environment for composite structure analysis and design in midas Civil

2. How to set a moving load analysis

3. How to set a construction stages analysis

4. How to set combinations of actions for design and/or check of elements

5. Study of composite sections from classification to design/check results

6. Comparisons of results between midas Civil and presenter’s personal spreadsheet

7. How to use the dynamic report generator tool

 


 

Let's take a little bit of a deeper dive into what our webinar covered. 

 

Steel composite bridges are widely used in the UK, so it is quite important to know how to model and design such kind of structures. The steel section’s classification is vital to structure both the modelling and the design approach. For class 1 and 2, plastic analysis of sections is allowed, so that construction sequences are not important for sections’ checks. For class 3 and 4, sections show an elastic behavior including buckling effects for the latter. Because of that, construction phases need to be taken into consideration while sections’ checks.


 

Flowchart for steel section classification

 

 

Flowchart for steel section classification

There are many advantages to using the midas Civil's steel composite girder bridge wizard feature. The wizard helps to model the initial steel bridge and it is also used as a template for other initial steel bridge. Layout, section, loads and construction stage can be easily generated by making automatically groups of them.

 

wizard

Lots of vehicle loads should be defined according to several different codes. In midas Civil, vehicles automatically placed to maximise or minimise forces on elements and long/short term effects automatically managed during the construction stage.

 


 

Define traffic line lane and traffic load

 

 

In order to perform the construction stage analysis, following data is required.

 

Step 1 : Groups

Step 2 : Time dependent material properties

Step 3 : Link time dependent and general materials

Step 4 : Construction stages and time steps

Step 5 : Composite sections for construction stage

Step 6 : Set up construction stage analysis option

Step 7 : Perform analysis

 

 


 

Construction Stage Analysis Inputs

 

 

 

 


Conclusion

 

Advantages in using composite girders:

- Reduction of buckling effects in comparison to full steel girder

- Reduction of weight and cracking in comparison to a reinforced concrete girder

- Easy and fast construction method with traffic disturbance reduced to min

- Reduction of deflections

 

Aspects to take into special consideration during design:

- Section : full plastic (class 1-2), elastic-plastic (class 3) and elastic (class 4)

- Construction stage analysis : relevant only for section class 3 and 4

- Bracing system : vital to spread forces between girders due to torque

- Stud : crucial element to allow the section to act compositely

 

Susbcribe
MIDAS Newsletter

Thank you, See you soon!
Share
About the author
Marco Bonomo | Senior Engineer | Atkins SNC Lavalin

Creative agencies know that showcasing their designs on Behance is one of the best ways to get their work in front of potential clients. Professionals can showcase their campaign and brand strategy skills by displaying the full range of the work an
agency does, including signage, digital advertising, product packaging, ad copy and web design. For that reason, the portfolios on Behance represent the best of the best.

Comments
Download Download the
Full Webinar PDF

Please fill out the below form to
download more detail information about this Case Study

All