4. How to Define Tendon Arrangement in midas Civil
5. Parametric Design Options
6. Conclusion
Rapid construction of Bridges has become ease of improving the transportation infrastructure of a city. For the same, the PSC bridges, in which girders are fabricated off-site and then transported and erected into place at the job site, are becoming common. Pre-Stressed Concrete (PSC) pre-caste girders are particularly economical when longer beam lengths are required; some types are suitable for spans of up to 200 feet.
In this article, the methods of applying prestress and variables to satisfy the design demands have been mentioned with the use of midas Civil software solution. The program considers all the losses in tendons by simulating the sequence of prestressing with respect to time.
Post-tensioning is the method of stressing the tendons, after concrete is cast, and installed in their final location, to create enough lateral compression that the beam-unit will resist the desired amount of vertical loading. This is perhaps the most readily available method of prestressing objects. This method requires that the beam elements are cast with hollow tubes such that prestressing tendons can be installed and loaded in situ.
Pre-tensioning is the method of introducing high-strength steel tendons to the beam element, stressing them to a predetermined load, and then casting the concrete around them. Once the concrete has gained enough strength, the load is released from the steel tendons, thereby transferring this load to the concrete portion of the composite member. It is the relative loading of the strands before the concrete is cast that gives this method its name.
Pre-stress can be applied externally to girders. Midas Civil facilitates this method also for tensioning the elements.
To meet the requirements of prestress in the girders, an Engineer has to decide the arrangement of tendon profile. In most cases, the tendon profile meets the demand of the flexural forces due to the permanent loads. The remainder loads are taken by the reinforcements in the cross section. In midas Civil, we can incorporate the stiffness of the cables and reinforcement in the overall analysis of the bridge.
The instantaneous and time-dependent implications of the effects of prestressing steel must be understood and accounted for in the prestressed concrete girder design process.
Loss of prestress can be characterized as that due to instantaneous loss and time-dependent loss. Losses due to anchorage set, friction, and elastic shortening are instantaneous. Losses due to creep, shrinkage, and relaxation are time-dependent. Following variables affect the final stresses in tendons.
In midas Civil, we have complete control on these parameters. The section can be transformed based on the option selected under the Construction Stage Analysis Control.
Along with the wizards available in midas Civil to model PSC Bridges, there are several methods to incorporate the tendon arrangements. The tools provided are:
Pre-tensioned tendons can be defined using PSC Wizard under the Tendon tab as shown in Image 3. This is mostly used for preliminary analysis.
Allows us to define preliminary tendon profile with a few input parameters. It is very useful when we define a tendon in several girder elements with the same profile. This tool can also be used to define a user-defined wizard.
There are Code-based tendon templates based on standard precast sections to automatically generate tendons in elements. The Auto Generation function provides the tendon databases for the UK, USA, AS, NZ and Italian section types:
In case the database is not suitable for the standard sections of a country, region or precast sections manufacturing company, then the tendon template allows the export and import of the tendon profiles. Over 40 tendon profiles can be generated quickly for different spans of Bridges, which otherwise could be a major time-consuming process, especially for a preliminary analysis.
Empowers the usage of AutoCAD DXF file to create tendon profile. Plan and elevation for the tendon to be imported is drawn separately in the DXF file.
We can copy the coordinates available in the excel file format and paste it in the definition of tendon profile as shown in the image below.
A parametric analysis can be performed by simple modification using MCT command shell for each profile.
The tendon properties assigned to a number of tendon profiles can be changed at the once. This would save enough time in modifying a huge number of tendons. Especially in case of improving the Debonded length of pretension type of tendon. In this way, we can attain Stress Control.
At the beam’s ends, the prestressing strands can result in unwanted internal stresses and cracking. By proper curtailment of the debonding tubes, the total effective prestressing force and its eccentricity can be varied over the length of the beam with their maximum values in the mid-span region. After defining the tendon length for complete length of the span, the program would automatically take the effect of bonded part according to the value provided in the debonded length at Start & End.
In any PSC bridge design, whether it is balance cantilever or continuous structure bridge, a great amount of time is spent on the iteration of tendon profile and tendon numbers to satisfy the design for a given bridge span or section. However, modifying the prestressing tendon is NOT-the-ONLY solution. This takes us to the wide range of variables in the design of a prestressed girder.
By considering the change in the number of tendons to satisfy the demand, one may obtain an economical or a feasible solution. In case the requirement of reinforcement is higher, and at the same time, the section size is such that many interferences or clash detection have occurred, then increasing the number of tendons seems to be a suitable option.
There has been quiet a debate on how a program should provide the optimized tendon profile. This is because optimizing a tendon profile involves parameters such as an engineering decision of whether to input more reinforcements or tendons and check the clashing at the same time, change in stiffness of the section due to duct location, or change the cross-section of the girder altogether, and so on, making it impossible to attain the “correct” solution.
Mostly, in the near future, better sophistication can be achieved by our developers to make the impossible as possible. Till then the MCT command can be utilized at its best for a parametric analysis.
A possibility of increasing the section depth, in case the architect permits, may become a solution to achieve desired flexural capacity instead of change in tendons. Apart from the size, one can substitute different shapes (as these are precast) for an economical and architecturally pleasant at the same time.
One can achieve to satisfy the flexural capacity of a PSC girder by adding more reinforcements. In midas Civil with addition of each rebar data, the stiffness of the girder can be modified for a practical analysis & design result.
The tendon profile in the design of a PSC girder is based on several factors such as the types of Prestressing, effective prestress after losses, number of tendons, arrangement of tendons, the addition of reinforcement, and change in section stiffness due to prestress and rebars. The possible method of parametric design is mostly based on the site requirements. Also, the cost of the structure is determined to conclude with the design of a prestress girder bridge.
In the end, it is the Engineering judgement that pays off. We have often heard names of Engineers involved in the design of a bridge rather than a machine. Then again, it is a great way of involving a partner like midas Civil to achieve successful commencement of a Bridge Project.